Installation of HVAC System for the containerized substation for the SRW Shuaibah SE Flank Development Project at PDO Site.
The HVAC system includes the following:
• Air conditioning system with 1 duty and 1 standby AHU/Air cooled condensing unit.
• HVAC distribution system contain all necessary distribution including motor starters and circuit protection for the electrical users of HVAC package.
• Provide relay actuated tripping mechanism in case of any signal from fire alarm panel.
• Supply and installation of HVAC Power Distribution Board & HVAC Control Panel
Location | : Shuaibah, PDO |
Client | : Petroleum Development Oman (PDO) |
Sub-Contractor | : Orbital Projects & Services LLC |
Year | : 2014 |
Orbital scope of work includes Design, Supply, Installation and Commissioning of Air Conditioning & Ventilation System for OOCEP Substation at Abu Tubul Block 60.
Location | : Abu Tubul Block 60 |
Client | : Oman Oil Company Exploration & Production LLC (OOCEP) |
Sub-Contractor | : Orbital Projects & Services LLC |
Year | : 2014 |