Construction of Substation Building including Civil building, Road, Compound wall, equipment foundation. The scope also includes Installation of all electrical accessories for the OUHI substation building. Installation include HV Panel, LV Panel, Capacitor bank, DG sets and Transformers.
Location | : North Batinah |
Client | : Majan Electricity Company |
Duration | : 12 months |
HSE Status | : No LTI |
All Civil and Structural works including shuttering, reinforcement and casting of footings and foundations as per the structural drawings issued.along with construction of 1.5m deep cable treenches and extension of existing fire wall. Our scope also includes the installation of all chequte plates, gratings with necessary supporting system with wadi stone filling over the gratings and all around the periphery with gravel spreading.
Location | : Sohar |
Client | : Sohar Steel LLC |
Year | : 2012 |
HSE Status | : No LTI |
Construction of 260 nos. of chambers scattered all over in Oman from Barka to Qantab for the provision of newly introduced SCADA system, which includes excavation in soft and hard rocks, shuttering with readymade panels of Doka system, reinforcement works for thrust and wing walls etc. complete with pre-casting and installation of cover slabs.
Location | : Barka to Qantab |
Client | : Public Authority for Electricity & Water PAEW |
Year | : 2012 |
HSE Status | : No LTI |