CONSTRUCTION OF PDO CAMP AT SAIH RAWL

ORBITAL SCOPE

Orbital scope includes all Civil activities,  Electrical and Plumbing works and all associated external Civil works like asphalt roads, interlocking walkways and service routes.

PROJECT SCOPE

Construction of Permanent accommodation building for PDO.

KEY DATA

Location : PDO Saih Rawl
Client : Petroleum Development Oman (PDO)
Contract : EMC Contract
Year : 2013 - 2014

project
project
project
project
CONSTRUCTION OF AIRPORT ARRIVAL HALL & FACILITY SHED AT QARN ALAM, PDO

ORBITAL SCOPE

The Scope includes all the constructional activities of airport arrival hall and maintenance shed at Qarn Alam.

As the part of Arrival hall construction Orbital had done the Dismantling of the existing arrival hall and constructed the new arrival hall with the following facilities for the PDO airport Qarn Alarm. The arrival hall includes Security room, Officers room, Prayer Room, Rest Room, Toilets, Baggage carousels etc. All the associated electromechanical activities for the completion of the project were taken care by the orbital.

Orbital has constructed the Facility shed of area 1800 Sq. Mtr. as the part of the Project. Facility Shed includes the area for Parking for Passenger boarding stairs, Tank truck aircraft refueler, and Lavatory service vehicles etc. area for the Officers.

KEY DATA

Location : Qarn Alam
Client : PDO
Contract : EMC Contract
Year : 2012 (On-going)

project
project
project
CONSTRUCTION OF DALEEL MESS BUILDING

ORBITAL SCOPE

The scope of work consists of construction of mess building including Kitchen, bakery, pot washing, dish washing, cold store, butchery, water store, cleaning store, vegetable store, dry store, reading room & toilets as per the requirements of Daleel Petroleum LLC. Area of the Building is  815.33 sq. mtrs.

Supply and installation of split units. All water & drainage works includes pips, fittings. Provision of proper ducting / sleeves for kitchen equipments as per its requirements.

<span 1.6em;\\"="" style="margin: 0px; padding: 0px; border: 0px; vertical-align: baseline;">All gas line including piping & fittings as per requirement of kitchen equipments. All heating electrical sockets including conduits, wiring, distribution boards from main source as per requirements of kitchen equipments. Supply & Installation of the Fire Alarm System.

KEY DATA

Location : Ibri
Client : Daleel Petroleum LLC
Contract : Orbital Projects & Services LLC
Year : 2012 - 2013

project
project
project
project
project
CONSTRUCTION OF BAUER NIMR MESS BUILDING

ORBITAL SCOPE

Orbital scope of work consist of Design, Procurement & Construction of Mess building at Nimr Water Treatment Project Site. The activities include all Civil, MEP & Finishing Works Works required for the completion of the project

KEY DATA

Location : Nimr/PDO South
Client : Bauer Nimr LLC
Contract : Orbital Projects & Services LLC
Year : 2013 -2014

project
project
CONSTRUCTION OF SUB STATION BUILDING AT MAF-PDO

ORBITAL SCOPE

The Scope includes Supply, Installation & Commissioning of Substation at PDO Head Quarters, Mina Al Fahal

Orbital has carried out the Site survey, Soil Investigation, Construction of Substation Building of 450 SqMtr, Casting of foundations for the Transformers & Capacitor bank, Construction of fire partition wall between the transformer and the bund wall between the transformers. The Scope also Included the construction of the Asphalt Roads, hard standings, path and surfacing inside the substation. The substation building was with elevated floor slab for the provision of openings for cable entry etc complete with application of Deck guard floor hardener and completes finishing of the building.

Apart from this Orbital has supplied and Installed 2 Nos of 10MVA transformer, All the Indoor and the outdoor lighting system, Earthing system of the Substation, Air-conditioning and ventilation system, Firefighting system as the Part of the Project.

KEY DATA

Location : Mina Al Fahal
Client : Petroleum Development of Oman
Year : 2012
HSE Status : No LTI