INSTALLATION OF GAS BOOTS FOR DEHYDRATION TANK AT DALEEL

ORBITAL SCOPE

Supply & Installation of 2 nos of new Gas Boots near Dehydration Tank. Demolition of existing 8" crude oil inlet lines to Dehydration tanks downstream of ESD valves. Construction of new 8" lines, from downstream of ESD valves to the new Gas Boots. Construction of new 8" vapours outlet lines from Gas Boots to the tie-in point near Atm. Flare Knock-out Vessel Demolition of the 4" lines up to the 4" ball valves from their present connection to oil inlet lines to tanks, at the downstream of ESD valves, and to connecting these lines at the upstream of the ESD valves, at the tie-in points. Connecting the new system with the existing system wherever required in order to take new system on line. Installation of piping supports and structures for the on-plot piping. Structural pipe supports and Structural platforms with RC foundations, etc. Construction of New Gas Boots Foundations. Pre-commissioning and commissioning of the new facility under this project.

KEY DATA

Location : Ibri
Client : Daleel Petroleum LLC
Contract : Orbital Projects & Services LLC
Year : 2012 - 2013

project
project
project
RELOCATION OF HORIZONTAL ESP (HESP) TO DALEEL B-BLOCK STATION

ORBITAL SCOPE

The sope of work covers Civil, Mechanical, Electrical and Instrumentation installation at B-Block Station Facilities associated with the installation of following main equipment:• Relocation and Installation of 2 Nos Horizontal Pumps (P-1105/06) and its accessories (Pumps Control Panels, DG set, DG Tank, LV board, 3 nos chemical injection skids etc) from HESP area to B block and hook up to existing suction and discharge header at Tie-ins locations

KEY DATA

Location : Ibri
Client : Daleel Petroleum LLC
Contract : Orbital Projects & Services LLC
Year : 2012 - 2013

project
project
project
project
project
project
project
project
project
project
PRODUCED WATER TREATMENT & WATER INJECTION UPGRADE PROJECT

ORBITAL SCOPE

Engineering, procurement, construction activities for Civil, Mechanical, Electrical and Instrumentation works at On-plot B Block Gathering Station.

Supply, Calibration, Installation & loop checking of all the instruments including Control valves, PSD valves, Impulse tubing etc associated with the Project. Laying, glanding & Termination of the Electrical & Instrumentation cables etc. Supply and Installation of  DO analyzers, IO cards, Power supply units etc.

KEY DATA

Location : Ibri
Client : Daleel Petroleum LLC
Contract : Orbital Projects & Services LLC
Year : 2011 - 2012

project
project
project
project
INSTALLATION OF METALLIC CONTAINERS AT BP KHAZZAN

ORBITAL SCOPE

Orbital scope of work includes the following:

• Installation of Master Skids
• Installation of 2 Room 2 Bath 2 Man Accommodation
• Installation of 2 Room 2 Bath 4 Man Accommodation
• Installation of Generator Skids
• Installation of Fuel Tank Skid
• Installation of Water Tank Skid
• Civil Foundation Works
• Plumbing, Water Supply and Drainage Installation

PROJECT DESCRIPTION

Design, Supply, Installation and Commissioning of 300man Camp at Khazzan, Sultanate of Oman

KEY DATA

Location : BP Khazzan
Client : MB Petroleum
Main Contract : Spacemaker (Emirates) LLC
Sub-Contractor : Orbital Projects & Services LLC
Year : 2014